Details: dobalapal-iii, iv and ghuntuposi-i lip earth work excavation in foundation & plinth in hard soil within 50 mtr. initial lead and 1.5 mtr initial lift including dressing and leveling the bed & depositing the soil with initial lead & lift as per direction of engineer-in-charge filling in foundation and plinth with sand watered and rammed cement concrete (1:4:8) with 4cm size hg crusher broken metal of approved quality from approved quarry with ramming watering and curring etc. cement concrete(1:2:4) with 12mm size black hg crusher broken chips of approved quality from approved quarry as per the direction of the engineer-in-charge. 1st class c.b. brick masonary in cement mortar (1:6) in f&p. 1st class c.b. brick masonary in cement mortar (1:6) in superstructure 12 mm thick cement plastering in cm (1:6) in f & p over brick work. rigid & smooth centering and shuttering including cost carriage of all materials cement concrete (1:2:4) with 12mm size black hg hand broken chips of approve
Sector: Irrigation