Description: Shifting and Construction of 33KV lines 11KV lines LT line and sub station for widening of Soro Manipur Road from 0 00 KM to 9 300 km in the District of Balasore in favour of SE RandB Division No I under Soro 1 Electrical Section Name of Work Shifting and Construction of 33KV lines 11KV lines LT line and sub station for widening of Soro Manipur Road from 0 00 KM to 9 300 km in the District of Balasore in favour of SE R B Division No I under Soro 1 Electrical Section against 6 Supervision Charge Scheme
Details: Line Part 150x150mm RS Joist (11Mtr long) (34.6kg/mtr) (SAIL/JINDAL/TATA make) 150x150mm RS Joist (13 Mtr long) (34.6kg/mtr) (SAIL/JINDAL/TATA make) 11 Mtr long 330kg PSC pole(including transporting cost upto store) 9mtr long 300kg PSC pole(including transportation cost) 11 kv V cross arm 11KV F CLAMP Back clamp for V cross arm 11KV pin insulator polymer Disc insulator (B&S)70 KN polymer HW fitting (B& S) 70KN 33KV V cross arm(10.2Kg each) 33 KV F Clamp 2.9 kg Each GI Back Clamp for V cross arm 33 KV Polymer Pin Insulator (10 KN) with Gl pin HW fitting (B& S) 90KN Disc insulator (B&S)90 KN polymer 100 x 50 x 6 mm G1 Channel (each 2.8 Mtr. Long (9.2kg/mir.) 2 no. 75 x 40 x 6 mm GI Channel (each 2.8 Mtr. Long 6.8kg/mtr.) with side angle 50 x 50 x 6 mm GI Angle (cach 2.8 Mtr. Long 4.5kg/mtr.) with side angle Fish Plate 50x6mm,2.36kg/mtr each 0.280 mtr length,6nos required=(6x2.36x0.280) HT stay set(complete). HT sta
Sector: PWD