Description: Restoration to Disty No 1 of Kendrapara Canal at different places for the year 2025 26 Name of Work Restoration to Disty No 1 of Kendrapara Canal at different places for the year 2025 26
Details: Earthwork excavation in foundation in all kind of soil with all leads, lifts, & delifts including dressing & leveling the bed and depositing the excavated materials away from worksite with all leads lifts and delifts etc complete as per direction of the Engineer-in-charge. Earth work in all kind of soil by mechanical means with all leads, lifts & delifts including loading into transportation vehicles and unloading from transported vehicles & depositing the same on properly prepared and scientificaly approved surface including rough dressing & breaking clods to a maximum 5cm to 7cm in size including removal of roots, bushes,other deleterious materials from transported earth with all cost, carriage, royalty + DMF+ EMF, Labour cess and laying in layers not exceding 0.30m. in depth & levelling the earthen embankments for all heights etc. complete as per direction of Engineer-in-charge. (Earth will be arranged by contractor at his own risk & payment will be made in level section.) Filling
Sector: Irrigation