Description: Construction of Trough in Disty No 8A from RD 7 750 Km to RD 7 882 Km near Nahanga of K Canal for the year 2025 26 Name of Work Construction of Trough in Disty No 8A from RD 7 750 Km to RD 7 882 Km near Nahanga of K Canal for the year 2025 26
Details: Earthwork excavation in foundation in all kind of soil with all leads, lifts, & delifts including dressing & leveling the bed and depositing the excavated materials away from worksite with all leads lifts and delifts etc complete as per direction of the Engineer-in-charge. Filling foundation and plinth with good quality sand including watering and ramming to required thickness with cost, carriage, royality with EMF,DMF,Additional Charges and all other taxes, T & P etc complete as per direction of the Engineer-in-charge. P.C.C work of M-15 grade with 40mm and downgraded black hard granite crusher broken stone chips including hoisting and laying including cost,carriage,royality with EMF,DMF,Additional Charges and taxes of all materials etc complete with curing as per direction of the Engineer-in-charge. R.C.C work of M-25 grade with 20mm and downgraded black hard granite (crusher broken) stone chips including hoisting and laying including cost, carriage, royality with EMF,DMF,Addi
Sector: Irrigation