Details: clearing and grubing shrub jungles, uprooting stumps and small bushes and trees below 1.0m. girth on premeasurement including disposing the debris away from the work site with supply of equipment, tools and plants with all leads, lifts, delifts, including labour, t & p, hire and running charges of all machineries, taxes, cess, etc. all complete as per the direction of the engineer-in-charge. earthwork in excavation of foundation in ordinary soil or gravelly soil with all leads, lifts & delifts including rough dressing and breaking clods to maximum 5cm to 7cm in size and levelling the bed & depositing the materials clear away from work site including all taxes, cess of materials, labour and t & p etc. all complete as per the direction of the engineer-in-charge. providing and laying cement concrete m-15 grade with 40 mm size and down graded crusher broken hard granite aggregates free from weathered skin and other deleterious materials of approved quality and uniform colour and texture
Sector: Irrigation