Details: earth work excavation hard soil or gravelly soil including dressing and leveling the bed and depositing the soil within initial lead of 50m and initial lift of 1.50m and breaking the clods 5cm to 7cm size and laying in layer not exceeding 0.30m depth complete as per specification and direction of the engineer-in-charge. filling in foundation & plinth with sand well watered to saturated condition and rammed including all cost, carriage, royalty, taxes of materials with all labour charges cess etc. complete as per the direction of the engineer-in-charge. cement concrete (1:3:6) with 40mm size hard granite crusher broken metal confirming to relevant bis specifications with all cost, conveyance, royalty of all materials t&p, cess including scaffolding, walkways & properly mixing, hoisting & placing concrete to desired workability & curing for recommended period etc. complete as per the direction of the engineer-in-charge. brick work with fly ash bricks 25cmx 12cm x 8cm size having
Sector: Water supply and Sewerage