Description: REINFORCEMENT OF BHELAGAON III BHELAGAON II AND KOTAGAON LIFT IRRIGATION PROJECT UNDER KALAMPUR BLOCK IN KALAHANDI DISTRICT Name of Work REINFORCEMENT OF BHELAGAON III BHELAGAON II KOTAGAON LIFT IRRIGATION PROJECT UNDER KALAMPUR BLOCK IN KALAHANDI DISTRICT OUT OF STATE PALN 2024 25
Details: Earth work excavation of foundation in hard soil within initial lead of 50m & lift of 1.5m including dressing and levelling the bed etc. Filling the foundation and plinth with excavated material as directed by the Engineer-incharge. Filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the Engineer-incharge. Cement concrete (1:4:8) with 4cm size h.g.b. hand broken metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc. complete as per the direction of the Engineer-incharge. Cement concrete (1:2:4) with 12mm size black C.B. hand broken chips of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement T&P required etc complete as per the direction of the Engineer-incha
Sector: Irrigation