Details: earthwork in hard soil including stoney earth in foundation including all lifts,delifts and leads including dressing and leveling the bed per the direction of the department. supplying and filling in foundation trenches and plinth,ditches with sand watered and rammed in layers not exceeding 23cm in depth with lead and lift including cost per diection of engineer-in-charge. cement concrete in propertion (1:4:8) foundation and floors using 4cm(3/2") size clean hard black crusher brocken granite metal of approved quality from approve quarry including hoistng lowering and laying in layers not exceeding 15 cm thick to the required level ramming, curing etc complete including all cost, conveyance , taxes,and royalitie of materials and labour with t&p reqiured for the work completed. random rubble stone masonary in c.m(1:6) in foundation and plinth by using hard black brocken granite stone including bond stones from approved quarry including splays circular moulding chamfering and corbellin
Sector: Water supply and Sewerage