Details: earth work in excavation in hard soil by mechanicalmeans by using excavator of 1 bucket capacity including dressing and leveling the bed up to the requireddepth and depositing the excavated materials at places away from the work site with initial lead of 0.50m and initial lift of 1.5m and alying in layers not exceeding to0.30 m and breaking clods and direction of enng.in.charge low density polyethylene film(black) 09- rp-5/ldpe high impact essistant, heavy duty grade-030 in thickness of 250 micron in the form of flat sheet of 6 mtrs width and length 6 mtrs above without having any joint confirming to is no-1.2 & 3 only materials shah be used in manufacturingpolyethyle›i< sfi.set 70 n per mm and the film shall have minimum tear strength labour for spreading stone dust, watering and compactingincluding all costs conveyance royality taxes etc complete cost of fitting and fixing of signage
Sector: Municipality