Details: a. civil work (phase-1) dismantling existing rcc foundation work and levelling the ground good, shifting of existing poles, new earth work in foundation, recasting civil work in foundation at desired location including anchoring, stacking debris outside the campus within an initial lead of 5 kms at suitable location etc. complete as per the direction of engineer-in-charge. b. mapping of theme (phase-1) programming / mapping, integration of the show with content, effect etc. c. hardware works (phase-1) equipment rack - 19" standard 36 u rack 600mm wide with all required accessories. earthing community kit, mounting bracket, cable manager, support angle, equipment shelf, mounting hardware, fan housing units etc, ventilated top and bottom covers with attractive styling. it has removable side panels with slam latches for easy access as per minimum specifications: designed and engineered specifically for easy assembly and rapid equipment integration at s
Sector: Tourism