Description: Construction of New Section Office at P H Section Patnagarh Name of Work Construction of New Section Office at P H Section Patnagarh
Details: Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. Filling in foundatin and plinth with sand watered and rammed including cost of sand & labour Cement concrete (1:4:8) with 4cm. Size hand broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete . Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) in foundation and plinth Fly ash bricks of 25cmx12cmx8cm. Size having crushing strength not less than 75 Kg/Sqcm. With dimensional tolerance +2%. percentin cement mortar (1:6) brick masonary in super structure 12mm thick cement plaster (1:6) over brick work with cement punning(Inside & Out side) Rigid smooth centring and shuttering for R.C.C. works inclu
Sector: Water supply and Sewerage