Details: providing, fitting and fixing of seal joint as per approved drawing and technical specification as per section 2600 of morth specificatios for road and bridge works etc complete. provding and laying micro concrete for repair of expansion joint incluinding cost, conveyance of materials as required for the work etc complete as per specification and direction of engineer-in-charge. providing and applying epoxy bonding coat between old and new concrete incluidng cost all materials, labour, conveyance & t&p etc. complete in all respects as per specification & direction of the engineer-in-charge. straighting, cutting, bending bent up or coiled rods, including cranking, hooking, welding or jointing the m.s. rods or tor confirming to is 432 (plain) and 1785 (tor) steel and binding, tying the grills, hoisting, lowering and placing in proper position required for rcc works including cost, conveyance and taxes of ms rods or tor steel and binding wires of 18 to 20 gauge and cost of all labour w
Sector: Road development