Details: earth work in excavation of foundation in hard soil including dressing and levelling the bed and depositing the soil within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of engineer-in-charge. construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required and compacting to meet requirement of table 300-2. supplying, filling in foundation and plinth with sand in 22.5 cm (9") thick layers including watering and ramming with cost, conveyance, royalties of sand with labour and t&p required for the work etc. complete (measurement will be taken on finished compacted section only). providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors using 4 cm. size black hard hand broken granite stone metal and screened and washed sharp sand for m
Sector: PWD