Details: clearing shrub jungles, uprooting stumps and small bushes and trees below 1m. girth, clearing the debris away from the work site etc. complete as per the direction of engineer-in-charge. earth work in excavation of foundation in all kind of soil with all lead and lift including dressing and leveling the bed and depositing the excavated earth away from work site within all leads & lifts, cost of all labour, t&p, cess & all other taxes as applicable etc. complete as per the direction of the engineer-in-charge. filling in foundation & plinth with sand well watered to saturated condition and rammed including all cost, carriage, royalty, taxes of materials with all labour charges cess etc. complete as per the direction of the engineer-in-charge. cement concrete m-15 with 40mm and downgraded size hard granite crusher broken metal for pcc work confirming to relevant bis specifications for all materials including scaffolding, walkways & properly mixing, hoisting & laying with desired workabili
Sector: Irrigation