Details: civil works (part-a) earth work excavation in foundation in hard soil with 50 mtr initial lead 1.5 m initial lift including rough dressing and breaking clods to 2 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer-in-charge. (excavation by manually) earth work excavation in foundation in hard soil with 50 mtr initial lead 1.5 m initial lift including rough dressing and breaking clods to 2 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer-in-charge.(excavation by mechanical means with excavator of bucket size 0.6m) filling foundation and plinth with sand watered and rammed as per direction of engineer-in-charge. cement concrete (1:4:8) with 4 cm size h.g metal as per direction of engineer-in-charge. cement concrete (1:2:4) with 12 cm size h.g chips as per direction of engineer-in-charge. rigid and smooth centering and shuttering for rcc work including false work and dismentalling them after casting includi
Sector: Irrigation