Details: civil works - lift irrigation schemes civil works name of work work schedule for installation and energisation of gunabandha ii l i project under ridf 2023 24 in banarpal block of angul district (part-a) earth work excavation in foundation in hard soil with 50 mtr initial lead 1.5 m initial lift including rough dressing and breaking clods to 2 cm to 7 cm and laying in layers not exceeding 0.3 m in depth as per direction of engineer-in-charge. (excavation by manually) earth work
Sector: Irrigation