Details: earth work in excavation of foundation in hard soil including dressing and levelling the bed up to the required depth & removing the excavated earth & depositing the same away from the work site within intial lead of 50 mtr & intial lift of 1.5 mtr, including cost of labour t&p articles required for the work including shoring ,shuttering ,propping & dewatering if required ,etc.complete in all respect as per the specification & direction of the engineer-in-charge supplying and fitting in foundation trenches and plinth with sand ,well watered and rammed in layers not exceeding 23cm in depth with all lead and lift including cost, conveyence, loading , uploading , royalities and taxes of all materials, cost of all labour, sundries, t&p required for the work etc. complite in all respect as directed by the engineer-in-charge providing and laying plain cement concrete of proportion (1:3:6) in foundation and floors (i.e. below the base course of flooring) using with 4 cm. size black hard crus
Sector: Water supply and Sewerage