Details: earth work in hard soil or gravelly soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the engineer-in-charge. filling foundation and plinth with sand and wel watered & rammed etc . complete including cost of sand . cement concrete (1:4:8) by using 4cm. size b.h.g.hand broken metal including cost, conveyance etc. complete. cement concrete (1:2:4) with 12mm. size hard broken granite chips (crusher broken) for r.c.c. works including hoisting, laying, all cost, conveyance, royality etc. complete. rcc work of m 20 grade with 20 mm and down grade black hard granite (hand broken) stone chips including hoisting and laying. supplying, fitting and placing uncoated hysd bar reinforcement complete as per drawing and technical specification. rigid and smooth centering and shuttering for rcc work ( for wall) r.c.c. foundation and plinth bend and footing bases