Details: e/w in excavation of foundation in hard soil mixed with stone boulders with all leads lifts and delifts including dewatering,rough dressing,levelling the bed cutting the sides of the trenches to design profile shoring and shuttering the sides of the trenches and depositing the excavated materials clear away from the work site and spreading the excavated materials in layer not exceeding 0.15cm in depth including all labour charges,labour cess complete in all respect as per approved drawing,design,specification and direction of engineer-in-charge. filling foundation and plinth with clean coarse sand of approved quality and from approved quarry well watered and rammed including cost conveyance royalty,taxes of all construction materials cost of all labour, labour cess and t & p required for the work with all leads lifts delifts complete as per specifications and direction of the engineer-in-charge. cement concrete m10 with 40mm down graded size hard granite crusher broken metal of appro
Sector: Irrigation