Details: davar-ii r/l earth work in hard soil for excavation of foundation including dressing and levlling the bed and depositing the soil within 50 mtr. initial lead and 1.5 mtr. initial lift as per direction of engineer-in-charge. filling in foundation and plinth with sand well watered and rammed including cost of sand as per direction of engineer-in-charge. c.c(1:4:8) with 4 cm. size h.b.g metal laying and hoisting etc. complete with curing as per direction of engineer-in-charge brick work with fly ash bricks of (23cm x 11 cm x 8 cm ) in cement mortar (1:6) in foundation and plinth with curing etc.complete as per direction of engineer-in-charge. cement concrete (1:2:4) for r.c.c. works with 12mm size h.g.b. chips including hoisting and laying etc. complete with curing as per direction of engineer-in-charge providing & supplying of m.s.rod for for m.s. reinforcement for r.c.c work including cutting, bending, binding & tying the grills & placing in position including cost of binding wir
Sector: Irrigation