Details: excavation in hard soil such as hard stiff clay, stiff black cotton, hard red earth, shales, moorum ordinary gravels, within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods and stacking rubble or spreading and leveling within the site as the case may be etc; complete.asper direction of the engineer-in-charge.(mechanical 60% & mannual 40%) filling in foundation and plinth with sand including watering and ramming etc complete as per the direction of the engineer-incharge. cement concrite(1:4:8) with 4cm size h.g.b. crusser broken metal of approved quality from approved quarry with ramming watering and curring etc.complete including cost , taxes, royality convence charges of all materials to work site,supply of cement t&p required etc.comelete as per the direction of the engineer-incharge. cement concrite(1:2:4) with 12mm size black crusher broken chips of approved quality from approved quarry with ramming watering and curring etc.complete including
Sector: Irrigation