Description: REINFORCEMENT OF SAMPOCH IV AND SAMPOCH V LIFT IRRIGATION PROJECT UNDER HARBHANGA BLOCK IN BOUDH DISTRICT Name of Work REINFORCEMENT OF SAMPOCH IV SAMPOCH V LIFT IRRIGATION PROJECT UNDER HARBHANGA BLOCK IN BOUDH DISTRICT
Details: Earth work excavation of foundation in hard soil within initial lead of 50m & lift of 1.5m including dressing and levelling the bed etc. Filling in F&P with excavated materials including well watered and rammed.(2/3 of respective earth work) Filling F and P with sand, well watered and rammed CC (1:4:8) with 4cm (1½”) size hard granite metal (Crusher Broken) CC (1:2:4) with 12mm (½”) size hard granite/C.B chips (Crusher broken) RCC (1:2:4) with 12mm (½”) size hard granite chips (Crusher broken) C.B/K.B. Brick masonary in cm(1:6) in foundation and plinth (25cm X 12cm X 8cm size) 12mm thick Cement plaster in CM (1:6) over brick work Cement punning over plastering Rigid smooth centering shuttering for R.C.C. work including all cost etc. complete Roof slab, R.C.C. floor, Landing Balcony, Projection sun shed & Chajja, Sheles Labour charge for M.S. reinforcement for R.C.C. work including cutting bending, binding & typing the grills & placing in position including cost of binding wire 18 to
Sector: Irrigation