Details: labour charges for site clearance and construction of approach road. cleaning and re-development of the tube well using their own compressor continuously worked till clear and adequate discharge is obtained from the tube well including lifting & lowering of s/s pumpset with transportation of lifting & lowering materials as per the direction of engineer-in-charge. e/work in excavation in hard soil in fdn. including rough dressing & levelling the bed not exceeding 0.30 m in depth as per specification :- filling in fdn. & plinth with sand watered and rammed :- cc (1:4:8) with 4 cm size hg metal :- filling with excavated materials :- cc (1:2:4) with 12mm.c.b.g.chips brick massonery in cm (1:6) in foundation and plinth (fly ash) brick massonery in cm (1:6) in (superstructure 12 mm th. cement plaster in cm (1:6) over brick massonery :- rigid & smooth centering & shuttering for rcc works including false works & dismentalling those after casting with complete cost (slab) rigid & smooth cente
Sector: Irrigation