Details: e/work in excavation in hard soil in fdn. including rough dressing & levelling the bed not exceeding 0.30 m depth as per specification filling in f&p with sand wall watered and rammed. c.c. (1:4:8) with 40mm size of h.g. metal. filling in f&p with excavated materials. cc (1:2:4) with 12mm size c.b. chips including hoisting and laying brick masonary in cm (1:6) in foundation & plinth.(fly ash) 12mm thick cement plaster over brick works. cement punning painting two coats with enamel paint for priming work including cost of paint & labour etc complete. rigid & smooth centering & shuttering for rcc works including false works & dismentalling those after casting with complete cost (slab) labour for m.s.reinforcement for rcc works including cost of m.s.rod, cutting, bending,binding & tying the grills and placing in position. display board writing cost of supply 30 cm sly wrench-1 no, 5/8 ring wrench-1 no, de spanner-1/2-1 no, 30 cm driver-1 no, insulated plier-1 no (taparia make) cost
Sector: Irrigation