Details: earth work excavation of foundation in hard soil within initial lead of 50m & lift of 1.5m including dressing and levelling the bed etc. filling in f&p with excavated materials including well watered and rammed.(2/3 of respective earth work) filling f and p with sand, well watered and rammed cc (1:4:8) with 4cm (1½”) size hard granite metal (crusher broken) cc (1:2:4) with 12mm (½”) size hard granite/c.b chips (crusher broken) rcc (1:2:4) with 12mm (½”) size hard granite chips (crusher broken) c.b/k.b. brick masonary in cm(1:6) in foundation and plinth (25cm x 12cm x 8cm size) 12mm thick cement plaster in cm (1:6) over brick work cement punning over plastering rigid smooth centering shuttering for r.c.c. work including all cost etc. complete roof slab, r.c.c. floor, landing balcony, projection sun shed & chajja, sheles labour charge for m.s. reinforcement for r.c.c. work including cutting bending, binding & typing the grills & placing in position including cost of binding wire 18 to
Sector: Irrigation