Details: silipada-iii and tando-iii lip earth work excavation in foundation & plinth in hard soil within 50 mtr. initial lead and 1.5 mtr initial lift including dressing and leveling the bed & depositing the soil with initial lead & lift as per direction of engineer-in-charge earthwork in excavation of foundation in hard soil such as hard stiff clay, stiff black cotton, hard red earth, shales, moorum ordinary gravels etc within 50m.initial lead and 1.5m. initial lift including rough dressing and levelling the bed and depositing the excavated materials within initial lead at nearby the worksite for reuse including breaking clods and stacking rubble for spreading and leveling as the case may be etc complete as per direction of the engineer-in-charge. (excavation by mechanical means 60% & manually 40%) filling in foundation and plinth with sand watered and rammed cement concrete (1:4:8) with 4cm size hg crusher broken metal of approved quality from approved quarry with ramming watering and currin
Sector: Irrigation