Details: earthwork in excavation of foundation in hard soil including dressing & levelling of bed within initial lead of 50mt. & lift of 1.5mtr etc complete as per the direction of the engineer-incharge. filling in foundation & plinth with sand including watering & ramming etc complete as per the direction of the engineer-incharge. cement concrete (1:4:8) with 4cm size h.g.b. hand broken metal of approved quality from approved quarry with ramming watering and curring etc. complete including cost, taxes, royalty convence charge of all material to worksite, supply of cement t&p required etc. complete as per the direction of the engineer-incharge. brick work with fly ash brick 25cm x 12cm x 8cm size having crushing strength not less than 75kg / cm2 with dimensional tolerrance + 8% in cement mortar (1:6) in foundation & plinth etc. complete as per the engineer-incharge. brick work with fly ash bricks 25cm x 12cm x 8cm size having crushing strength not less than 75 kg/cm2 with dimensional tolerance
Sector: Irrigation