Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials by manual means and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per technical specification clause 201 etc. complete & as per direction of the engineer-in-charge. loosening, levelling and compacting original ground scarified to a depth of 150mm thick as per specification and as per the direction of engineer-in-charge. dismantling and removing cement concrete including stacking the useful materials for reuse and removing the debris within 50m lead etc. complete as per direction of engineer-in-charge. removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works including t&p, sorting the
Sector: RDPR