Details: earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department etc. complete as per direction of engg-in-charge . excavation of founation in laterite rock or any hard rock (other than granite or disintigrated rock) removed by chiselling including dressing and levelling the bed not exceeding 1.5m in depth and depositing the soil within initial lead of 50m and as per specification approved by the department etc. complete as per direction of engg-in-charge . filling foundation and plinth with sand and well watered and rammed including cost, conveyance and royalty etc complete as per direction of engg.-in-charge
Sector: Agriculture Dept