Description: SR such as improvement to Connecting road from Talasahi Yubak sangh via old police station to Subash Chhak in Malkangiri Name of Work S R to such as Improvement to connecting road from NH 326 to Talasahi Yuvak Sangha via Old Police Station and Link road from Old Police Station to Subash Chak for the year 2024 25
Details: Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per Clause 503 of MoSRT&H Specifications for Road & Bridge works (4th Revision) Providing & Laying 25mm compacted thick S.D.B.C. of grading -2 using crushed stone Gr.-2 materials & 60/70 grade of bitumen preparing preemixed materials with bituminous binder with hot mix plant, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per clauses 501 and 508 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost, conveyance, royality & other taxes of materials, cost of labour, machinery, T&P etc complete. as per direction of Engineer-in-charge Providing and laying of hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads @ 2
Sector: PWD