Details: clearing and grubbing road land including uprooting wild vegetations, grass, bushes, shurbs, saplings and trees girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used etc. complete including cost. , conveyance, royalty, cess & taxes of all materials & cost of all labour & t&p required for the work etc complete as per specification & direction of engineer-in charge. (i) barakhama to daka road (or-25-291) (ii) sarangada to bandhudi road (or-25-293) earth work in excavation of foundation in hard or gravelly soil with all leads & lifts including dressing the sides & leveling the bed of the foundation to the required width & required depth including shoring shuttering, propping bullah, pilling, dewatering from foundation supplying & working of pumps including hire & running charges of pumps & all machineries required for the work & providing coffer dam if required & stacking the excavated material