Details: cutting holes in rcc floors & roof upto 19cm thick for passing gi/pvc earth work in ordinary soil within 50m. initial lead and 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm.to 7cm. and laying in layers not exceeding 0.3 m. in depth asper direction of the engineer-in-charge. filling foundation and plinth with sand and wel watered &rammedetc . complete including cost of sand . rcc work of m 20 grade with 20 mm and down grade black hard granite (hand broken) stone chips including hoisting and laying. rigid and smooth centering and shuttering for r.c.c. works including false works and dismentalingthen after casting including cost of materials complete. c) r.c.c. foundation and plinth bend and footing bases of columns, mass concrete, pre-cast slabs etc. providing,laying factory made chamfered ascement concrete pavor block of required strength thickness & size/shape made by table vibratorymethod to attain soperior smooth finish using pu or equivaient moulds,l
Sector: Municipality