Details: clearing & grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling, &trees girth upto 300 mm , removal of stumps of trees cut eralier & disposal of unserviceable material to be used or auctioned upto a lead of 1000 mtr including removal & disposal of top organic soil not exceeding 150 mm thickness as per direction of engineer in charge. construction of embankment with approved materials obtained from borrow pits transporting to site with all lifts and leads, spreading, grading to required and compacting to meet requirement of tables 300.1 and 300.2 as per technical specification clause 301.5 and as per the direction of the engineer-in-charge. construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement as per mord technical specification clause 301 and direction of the engineer in charge (excluding cost of excavation
Sector: RDPR