Details: clearing grass and removal of up to a distance of 50 mtr outside the periphery of the area and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness as per specification and as per the direction of engineer -in –charge. dismantaling of of brick / stone masonary in cement mortar above 3 mtr height for existing structures including t&p and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviciable materials and stacking the serviciable materials with all lifts and lead of 1000 m as per specification and as per the direction of engineer-in-charge. removing all type of hume pipes and stacking within a lead of 1000 metres including earthwork and dismantling of masonry works including t&p, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all
Sector: RDPR