Details: construction of rcc intake well rigid & smooth steel, centering & shuttering at all high for the work such as well curb & well staining using required numbers of verticals and horizontal supports of scaffolding with joists , ng rails , and channels and steel shutering plates including welding, bolting , cost conveyence , royality and all other taxes of all materials and cost of scaffolding gangway etc. including cost and conveyence of dismentalling and disposing debris, clear of work site complete to receive reinforcement grills and concrete as per the requirement as directed by engineer in charge. rcc m-20 grade with 20mm and down grade hbg chips including allcost,lead and royalties of materials supplying , fitting & placing uncoated hysd bar reinforcement complete as per drawing & technical specification etc. all complete rigid smooth centering and shuttering for rcc works including false work and dismantling then after casting including all cost, conveyance,taxes,royality etc.co
Sector: Water supply and Sewerage