Details: filling with sand well watered and compacted with appropriate rammer or mechanical compactor and top surface dressed and levelled to proper gradient as per direction of the engineer-in-charge including watering and ramming with cost conveyance, royalities, taxes of all materials and labour with required for the work etc. complete as per specification and direction of the engineer-in-charge. cement concrete of proportion 1:3:6 in foundation using 4cm size black broken granite stone aggregates of approved quality and from approved quarry including hoisting, lowering and laying concrete in layers not exceeding 15cm 6" thick to the required level ramming, watering, curing etc. complete including cost and conveyance royality taxes of all materials and labour with required for the work as per specification and direction of the engineer-in-charge. construction of un-reinforced , dowel jointed at expansion and construction only, plain concrete pavement, thickness as per design, ov
Sector: RDPR