Details: excavation, loading , unloading and carriage by mechanical means of all kind of soil including moorum. stoney earth, gravel etc. interspread with boulders up to 1/2 in size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by eic within an initial lead of 1 km. from the place of excavation complete. excavation of foundation in d.i. rock not required blasting ti be excavated manually by the hacksaw and crowbar to proper profile in all kinds of soil with initial lead and lift including dressing and leveling the bed to proper and level making it fit for laying concrete including depositing the excavated materials clear of work site with all leads and lifts including dewatering from foundation if necessary complete as directed by the engineer-in-charge. filling in foundation and plinth with excavated materials including watering and ramming as directed b
Sector: Irrigation