Details: excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the engineerin-charge within an initial lead of 1km from the place of excavation complete as per direction of the e.i.c.area-139.202 ac compacting and watering upto o.m.c. rolling earth work with p.r.r. in embankment in layers not exceeding 0.23m by power road roller including hire and running charges of the roller (measurement to be taken on the finished compacted section of the fill under o.m.c. condition) embankment pond & river side outer pond embankment side disposal of excavated earth by mechanical means 60% of total volume to be disposed at a distance 5km i.e=501642.00 40% of total volume to be disposed at a distance10km i.
Sector: Water supply and Sewerage