Details: clearing grass and removal of up to a distance of 50 metres out side the periphery of the area with all cost conveyance royalty, taxes of the materials and labour with t&p required for the work etc. complete or as directed by the engineer-in-charge. cleaning the existing black topped surface with removal of foreign materials with brooms or soft btrushes and finally dusting with old gunny bages and/or compressed air to receive bituminous etc complete as per direction of eic. providing, laying, spreading and compacting stone aggregate specific size to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3 wheeled steel roller 8-10 tonnes in stages to proper grade and camber the voids with small stones and hand packing the same to proper camber, applying and brooming requsite type of screening / binding materials filling up interstices of coarse agreegate, watering and compacting to the required density as per clause 404 of mosrt&h spec
Sector: RDPR