Details: clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness etc. complete as per specification and direction of the engineering in charge. conveying from stacks and spreading moorum on road surface to proper thickness and camber for topping including cost and carriage of materials etc.complete as per direction of engineer in charge cleaning the existing black topped surface with removal of foreign materials with brooms or soft btrushes and finally dusting with old gunny bages and/or compressed air to receive bituminous etc complete as per direction of eic. providing and applying primer coat with bitumen emulsion ( ms ) with all cost conveyance, labour t&p 4.0kg
Sector: RDPR