Details: c.c.(1:3:6) in foundation and plinth with 4cm. size h.g. metal including cost carriage etc complete. conveyance, royality , taxes of all materials required for the work, running and hire charges of machineries and all t & p required for the work, labour charges for the work complete in all respect as per the specification and direction of the engineer-in-charge. construction of un-reinforced, plain cement concrete pavement (m-30) over a prepared sub base with 43 grade cement @ 400 kg per , with 20mm & down graded size hard granite cruser broken chips over polythene sheet 125 micron including compacting with watering curing centering shuttering with cost of curing for 28 days, conveyance, royality , taxes of all materials required for the work, running and hire charges of machineries and all t & p required for the work, labour charges for the work complete in all respect as per the specification and direction of the engineer-in-charge. providing groove joints including fi
Sector: RDPR