Details: dismantlling and removing cement concrete including stacking the useful materials for re-use and removing the debries within 50mtr lead. earth work excavation in hard soil or gravelly soil within 50mtr. initial lead and 1.50mtr initial lift including rough dressing and levelling the bed with all cost, labour t & p etc complete convaying the exacavated earth away from the work site by mechnical means with in 5 km lead as per direction of eic filling in foundation with sand well watered & rammed including cost, conveyance, royalty & taxes etc. complete of all materials to work site as the specification approved by the department and direction of engg-in-charge. p:c:c: (1:4:8) using 4 cm. size h.g. (c.b) metal including the cost of all materials, labour carriage, royalty etc complete. c.c. work of m20 grade with 20 mm down grade chips (c.b.) including hoisting & laying 6mm thick c:p (1:4) finished smooth r.c.c. work of m20 grade with 20 mm down grade chips (c.b.) including hoisting & lay
Sector: Municipality