Details: clearing and grubbing road land including uprooting trees rank vegetation, grass, bushes, shrubs, saplings and girth up to 300 mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150 mm in thickness etc complete as per the direction of the engineer-in-charge. cleaning the existing granular base surface including removal of binding materials with wire brushes and small picks ,sweeping with brooms or soft brushes and finally dusting with old gunny bags and or compressed air to receive bituminous. labour for scrapping cleaning road surface applying tack coat using 3.00 kg of bitumen for 10 sqm and laying 37.5 mm thick busg in one layerusing 0.45 of 25 mm to 40 mm size granite metal and 12.00 kg bitumenof grade for 10 sqm with 0.12 of 12 mm size chips as key stone for 10 sqm spreading over and l
Sector: RDPR