Details: earth work in excavation of fondation in hard soil within the initial lead & lift including dressing & levelling the bed & depositiong the excavated earth away from the site etc. all complete as per the direction of engineer in charge. filling sand-supplying & filling good clean river sand of approved quality including watering to complete saturation & ramming complete with all leads & lifts including cost, conveyance, royalty & taxes of all materials & cost of all labour & t&p required for the work etc. complete as per specification & direction of engineer in charge. plain cement concrete m-15 grade in foundation complete as per drawing and technical specification. providing laying r.c.c. hume pipe np3 class for culverts including fixing collar with cement mortar 1:2 but excluding excavation, protection work, backfilling,concrete and masonry work in head walls and parapets clause 1106 of mord specification for rural roads and as per irection of engineer-in charge. (1200 mm dia) plai
Sector: RDPR