Details: providing 250mm dia 4.5m long single u/r pile foundation. earth work in excavation of foundation in hard soil within 50m. initial lead & 1.5m. initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth & levelling the bed as per the direction of the engineer-in-charge . supplying, filling in foundation and plinth with sand, watered and rammed including cost, conveyance & royality and all taxces of materials cost of all labour with t&p etc. complete. fly ash brick work in cement mortar (1:6) in f & p of size 10"x5"x3" having crushing strength not less than 75 kg/cm² with dimensional tolerance ± 8% including splays cutting circular moulding chamfering and corbelling and complete (cement to be used ultratech/ ambuja/ acc/ dalmia) rcc m-20 work with 20mm down grade h.g. c.b. chips including cost, conveyance & royality etc. complete. (cement to be used ultratech/ ambuja/ acc/ dalmia) rigid, smooth centering & shutte
Sector: Water supply and Sewerage