Details: excavation of foundation in stoney earth and gravel mixed with stone and boulder not exceeding .014 in volume within initial lead and lift including rough dressing breaking clods 5 cm to 7 cm and laying in layer not ecxeeding .3 m in depth and as per specification approved by the department including cost conveyance and taxes of all materials and cost of labour t&p required for the work complete as per the direction of engineer in charge . dry stone masonry or rough stone dry masonry for guard wall and retaining wall with stone other than granite quired , broken and stacked above .003 including cost and conveyance , royalty and taxes all materials and cost of labour welfare cess @ 1% etc. complete as per the direction of the engineer in charge. fixing of gi wire mesh 10 gauge with 100 mm x 100 mm spaced weight @ 1.45 kg / sqm over dry stone masonry or rough stone dry masonry for guard wall and retaining wall including cost and conveyance all materials and cost of all labour t& p r
Sector: Forest and Environment