Details: earthwork in excavation of foundation of structures as per approved drawing and technical specification including setting out, construction of shoring and bracing , removal of stumps and other deleterious material , dressing of sides and bottom , backfilling the excavated earth to the extent required and utilising the remaining earth locally for road work by mechanical means with hydraulic excavator of 0.9 bucket capacity as per clause 304 of mosrt&h, specification for road and bridge works (5th revision) (in ordinary soil) and as per direction of engineer-in-charge. upto 3.00 mtr depth providing sand filling in foundation of structures/ behind abutment wing walls & return wall as per approved drawing and technical specifications as per section 300 ,2100 & 2200 of mosrt&h specifications for road & bridge works (5th revision) including cost, conveyance, taxes, cess, royalties of all materials, cost of all labour, t&p required for the work etc. complete as per specification & directi
Sector: PWD