Details: part a: for toilet at central store civil work :- earth work excavation for plinth & foundation in hard soil or gravelly soil within 50 mtrs. initial lead and 1.5 mtrs.initial lift including rough dressing and breaking clods to maximum 5cm to 7cm laying in layers not exceeding 0.30 mtrs in depth as per direction of engineer-in-charge. supply & filling in foundation and plinth with sand watered and rammed including the cost, conveyance, royalty and labour charges etc. complete. cement concrete (1:3:6) with 4cm size hard granite metal including the cost, conveyance, royalty and labour charges etc.complete. r.c.c. work of ( 1:1.5:3) with 12 mm & down grade black hard granite chips( crusher broken) including hoisting, lowering, laying and compacting concrete, watering and curing and finishing the exposed surface smooth, providing grooves or beds where necessary including cost of all materials (excluding cost of tor steel) and cost of all labour with t & p required as per direction of eng
Sector: Generation