Details: clearing shrub jungles and uprooting stumps and small bushes and trees of below 1 meter girth on pre-measurement including removal of debris and depositing the same clear of work site with all leads, lifts and de-lifts etc., with supply of all labour and t&p required for the work etc., complete in all respect as directed by the engineer-in-charge. earth work in oridinary soil within 50m, initial lead and 1.5m, initial lift including rought dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per direction of the engineer-in-charge(measurement will be taken on the finished approved level section. 1/6th volume will deducted for settlement of embankment only). earth work in excavation of foundation in hard soil with all leads and lifts to proper and profile as per the requirement including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth to proper and profile with supply of
Sector: Irrigation