Details: earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification clause 1104 of mord including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter,and disposal upto a lead of 50m dressing of sides and bottom and backfilling with approved material upto a depth of 3m providing & filling good clean river sand of approved quality including watering to complete saturation & ramming complete including cost conveyance, royalty, cess & taxes of all materials & cost of all labour & t&p required for the work etc complete as per specification & direction of engineer-in charge. plain cement concrete m15 foundation sub structure levelling course below open foundation of head walls as per drawings & technical specification clause 802,803,1109,1202,1203 of mord plain cement concrete m-20 open foundation complete as per drawing and mord technical specification clause no 800,1100,1200 and as per direction of
Sector: RDPR